The error Message reads:
Interval node with the ID 4: The from-value is larger than the to-value
Message no. RH214
Diagnosis
The "from" value is larger than the "to" value for the interval node with ID 4 and node name .
Procedure
By swapping the "from" and "to" values you can get a valid hierarchy structure.
The Documentation is here:
http://help.sap.com/saphelp_nw73/helpdata/en/ba/45db1795cd41ae83230ae01e882500/frameset.htm
See also SAP Note 2023060 - 27.05.2014
But:
When I open the start-routine there is no default coding.
The documentation says:
The corresponding function call is created by default as a comment in a new start routine.
When I create the transformation I get a start routine automatically but there is no function call in the comments.
What is the exact coding needed here?
Many thanks.